02
Phase I of the Hubei Huangshi Port Bulk Cargo Terminal Project
Phase I of the Hubei Huangshi Port Bulk Cargo Terminal Project
is a representative showcase of [G81]'s high-end customization
capabilities. This project includes multiple key Conveyor
lines (such as C05, C13, C21, etc.), with core technical
parameters unified as: bandwidth B=1400mm, Conveyor Q=2400t/h,
operating speed V=2.5m/s. The longest single machine span
reaches 224.9 meters, with a maximum power of 250 kW. Based on
the customer's brand requirements, we provide the complete set
of equipment with a signature 'green series' special
anti-corrosion coating. This customized 'green' appearance not
only gives the dock a highly recognizable look, but its
high-standard industrial coating process also provides
outstanding resistance to salt spray and wear. Combined with
high-performance Transmission Pulley and precision Roller Set,
it achieves a perfect combination of visual aesthetics and
industrial performance.
Bulk cargo terminalPhase I of the projectGreen custom coatingCustom brand colorsHigh Performance Conveyor